Economic Indicators

The projected capacity of the Concentrator is 800,000 tons of ore per annum. During the first three years, the volume of ore processing from the open pit will be about 500,000-600,000 tons per annum. In the future, the underground mine will be put into operation, and ore processing capacity will increase to 800,000 tons per annum.

Concentrates Production at the Processing Capacity of 600,000 tons of ore*

  Production (thousand t) Metal Contained in the Concentrate
Copper Concentrate 12-13 App. 21.0%
Zinc Concentrate 13-14 App. 49.0%
Lead Concentrate 9-10 App. 46.0%
Total Concentrate 34-37  

*The projected data will be adjusted after the use of the technology